Dolbeau-Mistassini, May 22, 2015:
The wellhead, designed to connect a single horizontal landfill gas collector, is now on site.
This system will be located along the landfill site. It will extract solid and liquid elements within the landfill gas. After this cleaning, the landfill gas will be transported to the Pilot Plant to be upgraded.